Framing as of March 22, 2008.
Framing as of March 30, 2008.
Framing as of April 5, 2008.
Framing as of April 11, 2008.
The stairwell is a work of art. It has ridge skylights that let natural light into the stairwell. Then on each side, there are trapezoidal windows letting a view through the stairwell to windows at each end of the house.
April 11. The stairs are now in, so Rick can get up into his treehouse office on the top floor.

April 18. The scenic septic tanks are in.

April 19. Rick and the very muddy dogs in the kitchen. The rough plumbing is in and you can see the pipes for the kitchen sink behind Rick and for the veggie sink coming up through the floor behind the dog.
April 27. The roof underlayment is on and the metal roof has been delivered. It is there laying in the driveway, serving as an obstacle course for the dogs.